Organization Chart

    A. Description of Responsibilities / Key Achievements

    Responsibilities

    • Facility Planning Team
      • Budget planning for facility projects
      • Construction project planning, design, architectural consultation
      • Construction supervision and completion inspection
    • Facility Team 1
      • Fire protection, disaster prevention, interior renovation, and exterior design
      • Planning, designing, architectural consultation
      • Space inspections and supervision for architectural projects
    • Facility Team 2
      • Land development, landscaping, and roads
      • Design, construction management, and completion inspections
      • Transportation impact assessments
    • Mechanical Equipment Team 1
      • Planning, design, installation, and supervision for mechanical systems such as HVAC, energy systems, and labs
      • Safety management and other mechanical system tasks
    • Mechanical Equipment Team 2
      • Planning, design, installation, and supervision for electrical and telecommunication systems
      • Maintenance of electric, fire, and communication facilities
      • Elevator management

    Key Achievements

    • Expansion Projects
      • Construction of Industry-Academia Cooperation PLAZA
      • Remodeling and Extension of the College of Pharmacy
      • Construction of Natural Sciences Building No. 3
      • Construction of Joint Research Complex
      • Renovation of Two Buildings including the College of Arts
      • Expansion of the Semiconductor Joint Research Center
      • Construction of Laboratory Animal Center
      • Reconstruction of the Main Building of the Affiliated High School of the College of Education
      • (Funded) Construction of Medical Device Validation Center for Innovative Regenerative Medicine using Mechanobiomaterials
      • (Funded) Construction of Pharmaceutical Industry Future Talent Training Center
      • (Global) Development of Namwon Campus
      • (Policy) Installation of Facilities for the Disabled
      • (Policy) Asbestos Removal Project
      • (Policy) Construction of New Renewable Energy Facility
    • BTL Projects
      • Construction of Student Dormitory
      • Construction of Building No. 1, College of Agriculture and Life Sciences
      • Construction of Sports Complex
      • Construction of Dormitory Phase 5
      • Construction of Building No. 1, College of Engineering
    • General Maintenance Projects
      • Landscaping of Central Library 1st Floor Lounge
      • Landscaping of JBNU International Center Lounge
      • Installation of GHP (Gas Heat Pump) storage equipment
      • Replacement of aging pressure tanks, communication cables, distribution panels, and transformers
      • Replacement of aging chillers, windows, and elevator parts
      • Environmental improvement of auxiliary field
      • Replacement of deteriorated retaining walls at auxiliary Stadium
      • Exterior landscaping from Main Building to Humanities Building
      • Repair of walkway between the College of Arts Building No. 2 – North Gate
      • Creation of Garden and Rest Area behind the Second Library
      • Repair of Garden and walkway of the College of Engineering Building No. 6
      • Remodeling of the 77th Anniversary Memorial Hall
      • Improvement of the 3rd Floor Conference Room in Jinsu Hall
      • Environmental improvement and fire curtain installation at Samsung Cultural Center
      • Improvement of campus streetlights and lighting
      • Painting of building exteriors, facility walls, and roof waterproofing of Hanok building
      • Establishment of research and experimental laboratories for new faculty members
      • Supplementing fire inspection checklist items
      • Performance inspection and repair of mechanical equipment, desks, and wooden furniture
      • Renovation of lecture halls, lockers, and sinks
      • Maintenance of wooden decks and outdoor stairs on campus
      • Maintenance of ceiling-type and central HVAC systems
      • Replacement of deteriorated plumbing (outdoor valves, drainpipes, steam piping, etc.)
      • Installation of signage manufacturing facility
      • (Laboratory) Construction of Safety Infrastructure in Laboratories
      • Construction of Upper-Level Underground Parking Lot
      • Installation of Outdoor Display Board
      • Renovation Work of the Buan Experimental Forest
      • Installation of Biohazardous Waste Disposal System
      • Work Environment Improvements (for Faculty and Students)

    B. Organization Chart

    • Facilities Division
      • Facility Planning Team
      • Facility Team 1
      • Facility Team 2
      • Mechanical Equipment Team 1
      • Mechanical Equipment Team 2

    C. Location (Building)

    • 2nd Floor, Main Administration Building, Jeonbuk National University

    D. Contact Information

    • Tel: 063-270-2088
    • Email: pys@jbnu.ac.kr
    Loading